Green Hydrogen for a European Green DealA 2×40 GW Initiative
A roadmap for 40 GW electrolyser capacity in the EU by 2030 shows a 6 GW captive market (hydrogen production at the demand location) and 34 GW hydrogen market (hydrogen pro-duction near the resource). A roadmap for 40 GW electrolyser capacity in North Africa and Ukraine by 2030 includes 7.5 GW hydrogen pro-duction for the domestic market and a 32.5 GW hydrogen production capacity for export.
<p class="publication-author" hydrogen="" europe,="" uhc,="" eu-gcc,="" ahp,="" dii
<p class="publication-author" hydrogen="" europe,="" uhc,="" eu-gcc,="" ahp,="" dii